CETYS UNIVERSITY - MEXICO
Total System Size | 1.2 MW |
Total Number of Panels | 3,099 |
Mexicali | 2,873 SunPower Maxeon 2 panels (1.12 MW) |
Tijuana | 226 SunPower Performance 17 panels (80 kW) |
Est. Annual kWh Generation | 2,120,401 kWh |
Est.1st year savings from solar | $7.3 million MX Pesos |
Projected savings over 25 years | $184 million of MX Pesos |
Est. Payback Period | 5 years |
University of Malta- MALTA
Product | 1,745 Maxeon 3 Solar Panels @34Wp |
Project Type | 11 University Building Rooftops |
System Size | 602kWp, 944,800 MWh Annually |
Oil Tanking Malta Ltd - MALTA
Product | 368 Maxeon® 3 Solar Panels |
Project Type | Coastal Commercial Building Rooftop |
System Size | 120kWp, 185 MWh Annually |
Parliament Ta Malta - MALTA
Product | 264 E19 Maxeon Solar Panels @320Wp |
Project Type | Government Building Rooftop |
System Size | 85kWp, 120 MWh Annually |
Svalbard Airport - Norway
Project Type | Arctic Airport |
System Size | 140kW Maxeon panels |
NEOEN Renouvelle l’erergie - France
Project Type | Solar Car Port |
System Size | 16MW Maxeon panels |
POWERHOUSE - Norway
Project Type | Roof Top Solar |
System Size | 358,000 KWh Annually |